Abstract
The experimental setup was mounted, that allows monitoring and analyzing the vibratory connection process of a shaft and the bushing, when they are joined with interference. While changing the parameters of oscillations, the shaft and bushing connection time may be significantly reduced. Increasing the amplitude and frequency of vibrations also allows bigger penetration of the shaft into the bushing. The increase of pressing force allows reliable shaft connection in a wider frequency and amplitude range. It also helps to shorten the insertion time under constant parameters of vibrations.
About this article
Received
11 September 2011
Accepted
14 February 2012
Published
31 March 2012
Keywords
interference fit
vibratory connection
automatic assembly
Copyright © 2012 Vibroengineering
This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.